Skip to content

Design-build yard · Lossiemouth, Moray

Built for weatherthat argues back.

We walk the plot before we price it. Douglas fir, Caithness slate, and lime, for houses on the Moray coast.

An open building site with scaffolding and a frame going up

Douglas fir. This is the week the house becomes something you can stand in.

On this coast
14years
Handed over
41houses
In one yard
4trades
Next measure
Thumorning

Works

Houses we have already argued with the weather about.

  • A pale modern house with a long glazed wall
    Area
    186 m²
    Programme
    46 weeks
    Trades
    Stone, fir, lime
    Status
    Handed over

    The north wall is the quarry stone that was already on the plot. The frame inside is Douglas fir, left visible. One winter was spent in the frame, on purpose.

  • A low house beside open water
    Area
    92 m²
    Programme
    31 weeks
    Trades
    Concrete, larch
    Status
    Handed over

    A room for a boat and a room for a person. Board-formed concrete where the tide can see it, larch where it cannot. We built in the months the water allowed.

  • A concrete and glass public building
    Area
    240 m²
    Programme
    38 weeks
    Trades
    Cross-laminated timber
    Status
    On site

    Two classrooms and a corridor that does not echo. The wing is raised so the playground stays. The school has not closed. That is the programme.

  • A stone cottage with a dark roof
    Area
    Repair
    Programme
    14 weeks
    Trades
    Lime, slate
    Status
    Handed over

    The wall was lime, then it was cement. We took the cement off, let the stone dry, and put the lime back. A new slate roof. No new rooms.

Programme

Six stretches of time. The middle ones are muddy.

The visible week

Douglas fir, cut in the yard and raised on site. For a few days the house is a drawing you can walk through.

You leave with

A frame you can photograph, still open to the weather.

Trades

Four trades. The yard keeps the ones you can see.

An open construction site with scaffolding

Ground

Drains, the slab, and the level the rest of the house has to trust.

No slab over a drain we have not filled and watched.

A timber house standing in open country

Frame

Douglas fir you can see. Cut in the yard, raised in a week the weather agrees with.

No joint covered because the cut was out.

A stone house under a dark slate roof

Envelope

Caithness slate, lime on stone, and openings that face the weather we actually get.

No roof closed while the frame is wet.

A pale interior with timber and plaster

Fit

Doors, the stair, and the bench. The parts a hand meets every day.

No joinery ordered from a book we have not built from before.

Materials

What the houses are actually made of.

Used on Quarry House

Douglas fir

From a mill we can name. The frame, and sometimes the stair.

Vertical timber cladding on a house

The yard

The people who are actually on the tools.

Mairi Calder, site lead

Site

Sets the site out in the morning and will stop a pour that does not fall the way the drawing says.

From the site

Notes from weeks that did not go to plan.

The yard keeps a book. A date on the programme is a date.

  1. 12 Mar · Quarry House

    The slate went on dry. We had waited nine days. We could have pushed it. The timber would have told on us in November.

  2. 04 Feb · Elgin

    The school wing is up on pads and the playground is still a playground. The head teacher walked the corridor in her coat. It did not echo. That was the brief.

  3. 19 Nov · Hopeman

    Cement came off the croft wall in sheets. The stone underneath was fine. Helen has the lime. We start it when the wall has had a week of air.

Contact

Ask for a measure.

We price after the walk. The first visit is free if the plot is within an hour of the yard.

Yard
The Yard, 14 Seatown Road
Lossiemouth IV31 6JJ
Hours
  • Monday – Thursday07:30 – 16:30
  • Friday07:30 – 15:00
  • SaturdayBy measure
  • SundayClosed
What is it

When